https://secure.dawn3host.com/js/209047.js https://secure.dawn3host.com/209047.png

FCS equipment onboard the Technip vessel Deep Arctic

NEWS

All the latest news and developments from Fluid Control

 

FCS equipment onboard the Technip vessel Deep Arctic.

 

Apr 9, 2019 | News

Fluid Control Service (FCS) recently supplied a hose deployment system.

The package consisted of 550m of 2” 10k Black Eagle hose, hydraulic powered hose reel, 55kW HPU, Tilting hose chute c/w access platform and accumulator/hose cutter.

FCS successfully mobilized the equipment onboard the Technip vessel Deep Arctic to support client’s job for the Edradour project.

Other news

FCS equipment onboard the Technip vessel Deep Arctic Fluid Control

Baku Delivery

Our client contacted us on Friday afternoon with a request that required mobilisation of a single almost 0,5km length of 6ND SoluForce H-515 hose installed onto a deployment drum ~ that was the easy part as FCS carry this equipment ready for mobilisation. What was more challenging was the drum drive needed to match the equipment in destination country BAKU.

FCS equipment onboard the Technip vessel Deep Arctic Fluid Control

FCS delivers Hose Transfer System for TP3 Well Clean-up operation

Over that last Days FCS dedicated team have together with our client Equinor and representatives from the DeepOcean installation vessel team been busy spooling the 1,8km SoluForce hose system that is to be used for the transfer of Well Cleanup fluids between the Troll A platform and the DP2 shuttle tanker Siri Knutsen during to upcoming TP3 Well Clean-up operation.