Baku — Custom Drive Shaft & Hose System
500m SoluForce H-515 on a 4.5m drum with a custom drive shaft, built and shipped in one week.
A client called on a Friday afternoon. They needed a 500m length of 6ND SoluForce H-515 hose on a deployment drum. We carry that ready to go. The challenge was a custom drum drive to match equipment in Baku.
Working from the original manufacturing drawings, our machinists, welders, and technicians produced a custom drive shaft, butterfly and bearing assembly, fitted them to the 4.5m drum, tested everything, and prepared the unit for shipment within one week.
Our logistics provider Logitrans evaluated everything from air freight via Antonov Airlines to sea. Sea won — 32 days to Poti, Georgia, then 4 days overland to the client’s base in Baku.
"The ability to respond to complicated technical challenges more efficiently than their competitors, without jeopardizing the highest industry safety and quality standards, makes FCS an indispensable support function for our ongoing global, subsea pipeline operations."
— Client feedback, Baku subsea pipeline project
Other projects
See all projects
Edvard Grieg — Flexible Squeeze Riser
Replaced a 13-person manual rig-up with a single pre-rigged unit, all operations on one deck level.
World's First All-Electric CTDL
Coiled tubing to -2,400m. Fully electric. Plug and play on any vessel.
Deep-Water Pipeline Pre-Commissioning
Two downline systems for wet buckle contingency, leak testing, and dewatering — built and shipped in 10 weeks.