Offshore Transfer Hose System for Well Clean-Up
A platform-to-tanker hose package designed to transfer approximately 6,000 m³ of well clean-up fluids, with a dedicated deployment vessel supporting hose installation and recovery.
A platform-to-tanker transfer system designed to handle an estimated 6,000 m³ of well clean-up fluids at approximately 3,000 L/min.
Fluid Control Service developed a transfer hose package to move well clean-up fluids from an offshore platform to a receiving tanker. The tanker would carry the fluids to shore for treatment or disposal, while a separate deployment vessel would support hose installation and recovery.
The package combines SoluForce transfer hose with reels and spoolers for storage, deployment and recovery. A tilt chute guides the hose over the vessel edge, and hydraulic power units support operation of the hose-handling equipment.
The vessel deck layout brings the hose-handling equipment, workshop and cargo basket into one mobilisation plan.
6,000 m³
Estimated Transfer Volume
Approx. 3,000 L/min
Design Flow Rate
Other projects
See all projects
Edvard Grieg — Flexible Squeeze Riser
Replaced a 13-person manual rig-up with a single pre-rigged unit, all operations on one deck level.
FCS eCoil - World's First All-Electric CTDL
Coiled tubing to -2,400m. Fully electric. Plug and play on any vessel.
Deep-Water Pipeline Pre-Commissioning
Two downline systems for wet buckle contingency, leak testing, and dewatering — built and shipped in 10 weeks.
Phone
+47 51 64 49 50Address
Ljosheimsvegen 1
4050 Sola, Norway