https://secure.dawn3host.com/js/209047.js https://secure.dawn3host.com/209047.png

SoluForce H415

NEWS

All the latest news and developments from Fluid Control

 

SoluForce H415

 

Apr 3, 2019 | News

FCS has witnessed phenomenal growth in our Spooling and Inspection services. As part of a larger ongoing package for our long-term clients, SoluForce recently manufactured a 1,865km batch of SoluForce H415 product.

Naturally, Fluid Control Service teamed up with SoluForce to performed the spooling operation directly from the production line at the SoluForce Netherlands plant.

FCS’ Business Development Manager David Lewis was very pleased with the team performance commented “ Well done to all involved for a successful, efficient and safe operation carried out to schedule. The hoses will now be terminated and tested at Fluid Control Services´ purpose-built premises in Sola, Norway before being delivered to two of the major pre-commissioning contractors for use on operations in both Norway and Baku.

For further information, please do not hesitate to contact:

David Lewis – Sales & Business Development 

 

 

Other news

SoluForce H415 Fluid Control

Baku Delivery

Our client contacted us on Friday afternoon with a request that required mobilisation of a single almost 0,5km length of 6ND SoluForce H-515 hose installed onto a deployment drum ~ that was the easy part as FCS carry this equipment ready for mobilisation. What was more challenging was the drum drive needed to match the equipment in destination country BAKU.

SoluForce H415 Fluid Control

FCS delivers Hose Transfer System for TP3 Well Clean-up operation

Over that last Days FCS dedicated team have together with our client Equinor and representatives from the DeepOcean installation vessel team been busy spooling the 1,8km SoluForce hose system that is to be used for the transfer of Well Cleanup fluids between the Troll A platform and the DP2 shuttle tanker Siri Knutsen during to upcoming TP3 Well Clean-up operation.